The Hairdressers

Alpha were recently contacted by Equator, Beauty Salon in Birmingham, to change the glass in their shopfront window after a large crack had appeared. The shopfront glass measuring over 10 square meters had been broken and needed to be replaced. Working closely with Equator, Alpha also provided the graphics, we discussed all the designs the customer … Read more

The Entertainer, Bournemouth

Alpha were recently contacted by one of the UKs largest children’s toy stores, The Entertainer, with a specialist shopfront glazing project. At their Bournemouth store, located on the Castlepoint retail park, the 10.8mm shopfront glass measuring over 10 square meters had been broken and needed to be replaced. Working closely with the Castlepoint centre management … Read more

Three Store – Merry Hill

Three flagship store in Merry Hill is one of the largest stores open within the shopping centre.   Works took place out of hours, using Genie to help move the glass through the shopping mall and into place. Excellent skill and precision judgement to fit. We were able to install successfully on time and on the budget … Read more

St Modwen – Longbridge

Longbridge St Modwen successfully replaced toughened specialised external glazed curtain walling filmed.  The panel was just over 4 metres long and over 2 metres high.  This was craned up to the upper level and craned into position. Once again the work was completed achieving the clients objectives and importantly on time and on budget.

EMW – Milton Keynes

Two large 2 metre squared 6.4 and 8.8 laminated bronze DGU’s supplied and fitted for EMW in Milton Keynes site.   Spider crane and Truck mount required to replace the broken units following Health and Safety guidelines. Works were carried out at height on the building third floor, the specified units were made where designed using … Read more

Carphone Warehouse – Wolverhampton

Yes we did, following an attack at one of the Carphone Warehouse, we boarded every single window in one night to secure these premises for the client following the attack.  The internal shutters were damaged as well to gain access. We did re-glaze the windows in specialised laminated glass following this episode for the client … Read more

Innovation Centre – Longbridge

Our biggest challenge here was the uneven ground and getting plant machinery in.   Our senior technician Stephen after careful planning went with scaffolding to reach the window, once the glass was lifted onto the platform ensure the engineers safety the glass was fitted with ease.  The area was closed off to the public throughout the … Read more

Blythe Water Café – Solihull

This was one of our many projects which entailed a complete strip of all away existing single glazed windows and replacement and install of double-glazed uPVC windows. This particular job was challenging due to the nature of the business and popular location for the public to hold meetings.  There were certain timescales to adhere to … Read more